Vklop
Izberi temo
Povečaj
Pomanjšaj
Izklop teme

RCERO I.

The objective of the construction of the Celje Regional Waste Treatment Centre – Phase I was to ensure conditions that enable technologically modern and environmentally acceptable waste management for the entire region.

The project “Waste Treatment Centre Celje – Phase I” is a joint project of 24 municipalities of the Savinja region which have acceded to the collaborative problem solving of waste in a comprehensive manner.

The waste management system at the Celje Regional Waste Treatment Centre – Phase I was planned in a manner that meets the legislative requirements in the field of environmental protection which stipulate:

- reduction of the quantity of waste at source,
- reduction of the quantity of disposed waste,
- separate waste collection at source,
- reuse of separated waste types,
- thermal treatment of waste.

The main objective that we are trying to achieve is the protection and preservation of the environment while contributing to an increased quality of life by implementing an efficient waste management system.

The contractors of Phase I:

Construction:
Nivo, gradnje in ekologija, d.d., Celje, in a joint postition with the company Cestno podjetje Maribor d.d. Maribor

Supervision and professional consultancy services:
Navor, d.o.o.

rcero_i.jpg

This project is partially financed by the European Union

 

This project is partially financed by the Republic of Slovenia

 

This project contributes to the reduction of economic and social disparities between the citizens of the European Union

Kontakt

Kontakt:
03 425 64 00
03 425 64 12
info@simbio.si

Imate vprašanje?

Spletna stran uporablja piškotke za zagotavljanje boljše uporabniške izkušnje, optimizacijo prikaza prilagojenih vsebin in spremljanje statistike obiska. Z nadaljnjo uporabo se strinjate z uporabo piškotkov. Odločitev lahko spremenite s klikom na Piškotki in izberete povezavo "Izbriši piškotke".